This is the end product:

Needed: Lower rail, Upper rail and 2 side bars, first glued [and dried for 1 hour]:
[Note that thicker end of side bar attaches to upper rail:]

Then, nailed, 2 long nails [#18] at each end [8 nails total]:



Then separate guard rail

Insert foundation
And secure with 3 small nails
